| HS Code | 591188 |
As an accredited LyondellBasell HDPE 2723PM factory, we enforce strict quality protocols—every batch undergoes rigorous testing to ensure consistent efficacy and safety standards.
| Packing | LyondellBasell HDPE 2723PM: typically supplied in 25 kg bags, 40 bags per pallet, and 1,000 kg bulk bags. |
| Container Loading (20′ FCL) | One 20′ FCL container loaded with LyondellBasell HDPE 2723PM, 25 kg PE bags, palletized, shrink-wrapped, secured, approx. 24 MT net. |
| Shipping | Not regulated for transport. LyondellBasell HDPE 2723PM is a non-hazardous polyethylene resin in pellet form. Ship in sealed bags, boxes, or bulk containers. Keep dry, clean, and away from excessive heat. No special DOT, IMDG, or IATA labeling required. |
| Storage | Store LyondellBasell HDPE 2723PM in a cool, dry, well-ventilated area away from direct sunlight, heat, sparks, and flames. Keep in original, closed containers or bags on pallets to prevent moisture, dust, and contamination. Avoid contact with strong oxidizers. Maintain moderate temperatures and protect from prolonged UV exposure. Follow local regulations and the manufacturer’s safety data sheet. |
| Shelf Life | Shelf life is typically 24 months when stored unopened in dry, cool, ventilated conditions, away from direct sunlight and heat. |
For thin-wall dairy tubs with sidewall stock between 0.60 mm and 0.85 mm, LyondellBasell HDPE 2723PM is processed as a neat feed at 100 PHR, with a polyethylene-compatible colour masterbatch limited to 2.0–4.0 wt% when tinted tubs or snap-on lids are specified; slip and antiblock concentrates containing erucamide are not incorporated because overall migration under Commission Regulation (EU) No 10/2011 must remain below 10 mg/dm² for fatty foods, and the U.S. route requires compliance with FDA 21 CFR 177.1520(c) 3.1a for olefin polymers. The production cell for this stock range is a high-speed accumulator-assisted injection moulding press with clamp force of 1,800–2,500 kN, screw L/D ratio of 20:1–24:1, compression ratio of 2.2:1, barrel zone temperatures set between 200°C and 230°C, and mould coolant at 8–15°C; cavity fill time is held below 0.9 s and holding pressure is applied at 45–65 MPa. Production-scale failure records show that demoulding above 52°C produces gate-area sink marks because post-ejection crystallisation continues toward the nominal density of 0.954 g/cm³ measured by ISO 1183-1:2019, while barrel residence time above 6 min at 230°C increases shot-weight coefficient of variation beyond 0.8% and induces visible flow lines in 250 ml pots. Terminal moulded articles include 250–500 ml dairy dip pots, 100–250 ml spread tubs, and 454 g delicatessen containers with snap-on HDPE lids.
When cap panel thickness is reduced below 1.0 mm in still-water and dairy beverage closures, cavity-to-cavity shot consistency becomes the dominant control variable, and the resin is let down at 100 PHR virgin with post-industrial regrind allowed at 10–20 wt% only after melt viscosity checks by ISO 1133-1:2022 confirm a shift of no more than 3 g/10 min; if consumer-recycled HDPE is introduced at 10–15 wt%, the processor must verify that the recovered fraction is covered by an FDA no-objection letter or an EFSA-recommended recycling process under Commission Regulation (EU) 2022/1616, otherwise the cap is limited to non-food contact, and an organoleptic scavenger masterbatch is dosed at 0.5–1.0 wt% to suppress odour transfer. The tooling normally employs 32–64 valve-gated hot runner cavities with clamp force of 2,000–3,500 kN, melt temperature of 210–240°C, hot runner tip temperature controlled within ±5°C, mould temperature of 10–16°C, injection pressure of 70–95 MPa, and total cycle time of 5.5–8.0 s. Valve pin synchronisation is held within 0.2 s; wider skew causes brim waviness and cap flatness deviations. Torque retention is assessed under ASTM D2063-23 after 24 h conditioning at 23°C and 50% RH, with acceptance above 1.1 N·m. Finished closure types include 30/25 mm dairy caps, 38 mm still-water caps, and 48 mm edible oil plugs where the food-contact status falls under FDA 21 CFR 177.1520(c) 3.2a.
Injection moulding of 20 L open-top pails from HDPE 2723PM requires a core/cavity coolant temperature differential held between 5°C and 10°C; wider differentials produce sidewall ovality above 1.5 mm across the widest diameter and can prevent lid sealing. The resin is processed at 100 PHR without internal mould release agents above 0.2 wt%, because sidewall environmental stress-crack resistance measured under ASTM D1693-21 in 10% Igepal CO-630 falls below 150 h when incompatible release-to-masterbatch ratios are used; antistatic masterbatch is dosed at 1.0–2.0 wt% only where dust protection is specified. Injection presses used for the pails have clamp force of 6,000–9,000 kN, melt temperature of 210–250°C, mould temperature of 12–20°C, cooling time of 12–20 s, and sidewall thickness of 1.8–2.2 mm. Drop failure occurs when the bottom radius is packed too rapidly at injection speeds above 140 mm/s, producing delamination at the bottom wall junction; filling acceleration is therefore staged with a short shot 5–8% below full cushion. Regulatory compliance for dangerous-goods liquids, when certified by the moulder, follows the UN 1H2 designation and ADR/RID closure integrity validated by ASTM D5276-23 drop testing from 1.5 m after conditioning at -18°C. Terminal pail volumes include 5 L, 10 L, 20 L, and 25 L open-top containers for water-based paints, aqueous adhesives, and synthetic lubricant greases.
Storage crate tooling with base grid thicknesses of 4.0–6.0 mm reverses the thin-wall fill strategy used in dairy tubs, because the gate must be sized above 1.5 mm to prevent freeze-off before the rib network packs. HDPE 2723PM is let down at 100 PHR and is combined with 2.0–5.0 wt% TiO₂-based white masterbatch and, for outdoor-rated crates, 0.2–0.5 wt% hindered amine light stabilizer masterbatch; UV-stabilised grades must comply with REACH (EC) No 1907/2006 Annex XVII restrictions and tensile yield stress must remain above 22 MPa when tested by ASTM D638-22 at 50 mm/min. Processing uses multicavity stack moulds on clamp force of 8,000–12,000 kN, melt temperature of 220–260°C, mould temperature of 15–40°C, and cycle range of 25–45 s. The ejection plate must not engage above 60°C part surface temperature; premature ejection at speeds above 100 mm/s leads to base-grid distortion and hinge post deflection in folding-crate designs. Finished products include 30–50 L foldable distribution crates, beverage yard totes, and pallet-compatible logistics containers.
Following a shift to 28/410 lotion pump collars and cosmetic bottle caps, the critical failure mode becomes thread-surface slip migration when erucamide is added above 0.2 wt%, because residual slip lowers removal torque below 1.5 N·m after 24 h at 23°C/50% RH. The formulation therefore consists of 100 PHR HDPE 2723PM with 1.0–3.0 wt% cosmetic-grade colour masterbatch, and no internal release agent is used unless the mould finish is below VDI 30; when external mould release is necessary, it is kept at 0.1–0.3 g/m² and verified by surface energy testing above 38 mN/m. The injection process for 24/410 and 28/410 caps runs on 1,200–1,800 kN presses with 24–32 cavities, melt temperature of 210–235°C, mould temperature of 10–18°C, injection pressure of 65–85 MPa, and a material cushion of 3.0–4.0 mm; colour change cycles show shot weight variation of 1.2–2.0% if the cushion is not returned to this band. Compliance is assessed against REACH (EC) No 1907/2006 Article 33 for SVHC communication at the 0.1 wt% threshold and European Cosmetic Regulation (EC) No 1223/2009 packaging compatibility without Annex II-restricted colourants. Finished terminal parts include 24/410 and 28/410 ribbed cosmetic caps, lotion pump collars, and non-hinged sifter caps for personal care.
Specimen cup production in an ISO Class 8 cleanroom changes the release and reclaim rules that are acceptable in food tub moulding, because no post-consumer reclaim is permitted in the feed stream and even post-industrial regrind from the same tool must be validated under ISO 10993-5:2009 before reuse. The resin is processed at 100% virgin HDPE 2723PM under a quality system audited to ISO 13485:2016; a medical-grade colour masterbatch may be added at 2.0–4.0 wt% only when supported by USP plastic monographs, and external mould release is limited to 0.1–0.3 g/m² and must be followed by a solvent-wipe procedure to prevent cytotoxic residue. Injection moulding runs on cleanroom presses with clamp force of 1,500–2,200 kN, melt temperature of 200–230°C, mould temperature of 5–12°C, and cycle time driven by 0.8–1.2 mm wall stock; hot-runner systems are preferred, and operator contact is reduced by automatic part removal. The primary process bottleneck is backflow through degraded check rings in screw barrels after 300,000 cycles, which produces black speck contamination and causes batch rejection under USP <661.1> plastic packaging requirements. Terminal products include 30–120 ml specimen transport cups, 20 ml collection tubes, and reagent cartridge housings for diagnostic instruments; all human-tissue contact claims require further validator testing beyond material certification.
Competitive LyondellBasell HDPE 2723PM prices that fit your budget—flexible terms and customized quotes for every order.
For samples, pricing, or more information, please contact us at +8618136850665 or mail to admin@ascent-chem.com.
We will respond to you as soon as possible.
Tel: +8618136850665
Email: admin@ascent-chem.com
Flexible payment, competitive price, premium service - Inquire now!