Products

Dongguan Zhongen PC/ABS FR2000BK

    • Product Name: Dongguan Zhongen PC/ABS FR2000BK
    • Factroy Site: Yinchuan, Ningxia, China
    • Price Inquiry: sales8@ascent-chem.com
    • Manufacturer: Ascent Petrochem Holdings Co., Limited
    • CONTACT NOW
    VTB
    Specifications
    HS Code 225681
    Product Name Dongguan Zhongen PC/ABS FR2000BK
    Manufacturer Dongguan Zhongen Plastic Materials Co., Ltd.
    Grade FR2000BK
    Color Black
    Mold Shrinkage Percent 0.4-0.6
    Flammability Ul94 V-0
    Processing Temperature C 230-260
    Drying Temperature C 100-120
    Drying Time H 2-4

    As an accredited Dongguan Zhongen PC/ABS FR2000BK factory, we enforce strict quality protocols—every batch undergoes rigorous testing to ensure consistent efficacy and safety standards.

    Packing & Storage
    Packing Dongguan Zhongen PC/ABS FR2000BK resin is packed in 25 kg moisture-barrier bags, 40 bags per pallet, totaling 1,000 kg.
    Container Loading (20′ FCL) Dongguan Zhongen PC/ABS FR2000BK is loaded in a 20′ FCL container, securely packed and stowed for export shipment.
    Shipping Dongguan Zhongen PC/ABS FR2000BK is shipped as black, flame-retardant thermoplastic pellets in sealed moisture-barrier bags, usually 25 kg net, palletized in export cartons. Handle as non-hazardous industrial polymer; keep dry and avoid heat, sunlight, and contamination. Standard freight applies; confirm classification against current SDS.
    Storage Store Dongguan Zhongen PC/ABS FR2000BK in a cool, dry, well-ventilated area away from direct sunlight, heat, flames, and oxidizing materials. Keep in original, tightly closed containers to protect from moisture, dust, and contamination. Avoid prolonged high humidity or temperature extremes. Stack securely to prevent damage, observe shelf-life, and follow first-in, first-out stock rotation. Ensure good ventilation and prevent static buildup.
    Shelf Life Typically 12 months in original unopened packaging, stored dry, below 30°C, away from direct sunlight and moisture.
    Application of Dongguan Zhongen PC/ABS FR2000BK
    Within AC charging pile enclosures where wall thickness transitions from 3.0 mm bosses to 2.0 mm snap-fit arms, Dongguan Zhongen PC/ABS FR2000BK is dried to a target moisture content below 0.02 wt% prior to injection moulding. Drying is executed in a desiccant dryer with a dew point below −30 °C, at 80–90 °C for 3–4 h. A hopper-mounted moisture analyser is used on multi-shift production lines because regrind from sprues and rejected faceplates reintroduces surface-absorbed water. The compound is metered with a gravimetric blender when regrind is added at a maximum ratio of 20 wt%; higher regrind fractions reduce melt viscosity sufficiently to shift flame-retardant distribution and produce visible flow lines at gate areas. Melt temperature is maintained at 250–260 °C at the nozzle. The barrel profile is set to a flat-to-reverse profile from 240 °C to 260 °C so that the FR additive package does not accumulate in the compression zone. Mould temperature is held at 70–80 °C with turbulent water channels; lower mould temperatures cause gloss variation and poor knit-line strength at the cable entry cut-out. Screw rotation speed is limited to 80–120 rpm, and back pressure is held at 0.5–1.0 MPa to avoid frictional heat generation above the degradation threshold.The part family comprises AC charger faceplates, plug holsters, terminal covers, and cable management brackets. These parts are assessed under IEC 61851-1, UL 2594, and regional EVSE standards. Flame class is typically required at V-0 at 1.5 mm or 2.0 mm according to IEC 60695-11-10 or the equivalent UL 94 vertical burn protocol. End-product glow-wire testing under IEC 60695-2-11 is conducted at 850 °C on the final moulded housing. Charger installers and certification bodies require that flame does not propagate from an internal resistor fault to adjacent surfaces. Comparative tracking index under IEC 60112 should be verified on moulded plaques, not raw pellets, because orientation and surface skin layers alter tracking resistance. Damp-heat cycling under IEC 60068-2-30 is relevant for outdoor or semi-outdoor installations. The material must not exhibit delamination or significant post-cycle warpage beyond 0.1% of a 120 mm span. Weld-line strength at the charge plug holster is monitored because this region experiences repeated insertion and removal loads. A 45° gate orientation and sequential valve gating move the weld line away from the highest tensile stress.Production experience on 1200 kN hydraulic injection moulding machines indicates that gate blush occurs when injection velocity exceeds 220 mm/s into small fan gates. The corrective action is to reduce velocity to 180–200 mm/s, increase melt cushion to 4–6 mm, and profile packing pressure from 60 MPa to 30 MPa over 4 s. Tool venting at 0.02–0.03 mm depth prevents gas burn at the end-of-fill near the snap-fit arms. Screw recovery is set so that total melt residence time remains below 8 min. Residence times above 12 min produce acrid odour and surface splay from partially degraded flame-retardant species. The terminal products are not post-painted because solvent-borne coatings introduce stress cracking around weld lines. Mould surface texture is applied by chemical etching or laser texturing instead.

    What Limits Wall Thickness in Server PSU Housings Moulded from FR2000BK?

    Melt residence time and flow-length-to-thickness ratio, not flame retardant loading alone, define the minimum practical wall section in server power supply unit housings. Server PSU shells are produced with nominal wall thickness of 1.6 mm and internal ribs at 0.9 mm. The rib thickness is held to 60% of the nominal wall to prevent sink marks and delayed crystallization at the rib root. The flow length from a central pin gate to the distal fan bracket exceeds 130 mm, producing an L/t ratio above 80:1. This requires a melt temperature of 255–265 °C, a mould temperature of 80 °C, and injection pressure at the machine of 100–140 MPa. Packing pressure is set to 70–80 MPa for 2–3 s and then reduced in 10 MPa steps. A mould temperature below 70 °C freezes the flow front before the flame-retardant additive has oriented uniformly. This produces visible charge flow lines and a drop in UL 94 vertical burn consistency at the fan bracket rib.

    EvaluationStandard / methodApplication-specific acceptance basis
    Fire enclosureIEC 62368-1:2023Plastic enclosure parts must not allow flame to reach internal wiring after an internal fault
    Flammability classUL 94 / IEC 60695-11-10V-0 at 1.6 mm moulded wall
    Glow-wire flammabilityIEC 60695-2-11No ignition or self-extinguishing within 30 s at 850 °C
    Tracking indexIEC 60112CTI measured on moulded surface; required by creepage distance calculations

    Hot runner valve gates are used on four-cavity PSU tools. Gate diameter is 0.8–1.0 mm; smaller gates freeze before packing completes and cause sink at the AC inlet boss. Larger gates increase gate vestige and require downstream deflashing. The tool is vented to 0.02 mm depth over a full perimeter channel. Insufficient venting produces burn marks at the fan bracket end-of-fill because trapped air and low-molecular-weight flame-retardant degradation products ignite locally under adiabatic compression. Screw speed is capped at 100 rpm, and back pressure at 0.6 MPa. A decompression stroke of 3–5 mm prevents drooling from open nozzles during semi-automatic operation. The finished components include PSU bottom shells, top covers, fan baffles, and AC inlet brackets. Published property data for FR2000BK under continuous service above 85 °C in PSU environments is limited; long-term thermal aging must be confirmed against UL 746B relative thermal index for the specific grade.

    Battery module end plates moulded in four-cavity tools expose the compound to hold-pressure decay at gate freeze-off. This causes internal voids if the gate diameter is too small. Battery energy storage system enclosures use wall sections of 2.5–3.0 mm to maintain V-0 performance after moulded-in inserts for busbar retention are loaded. The selected gate diameter is 1.2–1.5 mm with a full-round runner or valve-gate drop. A gate diameter below 1.0 mm freezes before the packing stage can compensate for volumetric shrinkage, creating voids at the base of inserted brass nuts. Melt temperature is held at 245–255 °C; higher temperatures reduce viscosity enough for thin ribs to fill but increase the release of acidic degradation species that can corrode unprotected mould inserts. Mould temperature is controlled at 75–85 °C. Packing pressure is set to 50–70 MPa for 5–6 s. The longer packing time is required because thickened bosses around busbar mounts have a local section of 4.5 mm, which cools more slowly than adjacent walls.Regrind is limited to 15 wt% in battery module applications because repeated heat histories reduce the notched Charpy impact energy and narrow the UL 94 V-0 margin. The material is lot-batch sampled every 4 h for melt flow index using ISO 1133-1:2022 at 260 °C/5 kg. Drift outside the qualified band indicates residence-time upset or contamination. Gas counterpressure is used in tool cavities where sink marks are not acceptable on busbar cover sealing faces. The counterpressure level is 0.5–1.0 MPa. System-level battery safety under IEC 62619:2022 and UL 9540A is conducted on the complete module or rack, not on the polymer alone. The polymeric housing contribution is evaluated separately through UL 94 at 3.0 mm, glow-wire ignition temperature under IEC 60695-2-13, and comparative tracking index under IEC 60112. Terminal parts include battery rack end plates, busbar covers, module side plates, and auxiliary control box lids.

    When Portable Appliance Housings Must Pass 850 °C Glow-Wire Tests Without Secondary Shielding

    Portable appliance housings that carry a double-insulation marking require the plastic enclosure to serve as both mechanical protection and electrical insulation. PC/ABS FR2000BK is processed at a melt temperature of 240–250 °C for power tool body halves where a high-gloss surface is not required but a uniform etched texture is specified. Mould temperature is held at 60–70 °C; this lower range reduces cycle time but narrows the weld-line strength at screw bosses. Injection velocity is set to 180–220 mm/s and profiled to 120 mm/s in the last 10% of fill to prevent jetting around the tool parting line. Holding pressure is 45–60 MPa for 3 s. The screw L/D ratio is 20:1 or 22:1; shorter plasticating units are not recommended because flame-retardant packages require homogeneous distribution without high-shear melting.

    The relevant safety standard is IEC 60335-1, which invokes glow-wire testing per IEC 60695-2-11 at 750 °C for unattended appliances with current above 0.5 A and at 850 °C for appliances that are attended or used with higher energy. Moulded housings are tested on the final part, not on plaques, because material flow and weld-line orientation affect ignition behaviour. The compound must also survive ball-pressure testing under IEC 60695-10-2; moulded specimens are conditioned at 125 °C and the impression diameter is measured after removal of the load. Typical terminal components are angle grinder body halves, heat gun housings, orbital sander motor covers, and portable vacuum cleaner shells. The material is not specified for parts in direct contact with a flame source or for parts with wall thickness below 1.2 mm because flame performance at thin sections becomes inconsistent.

    Medical Cart Housing Compliance and Chemical Sterilant Compatibility

    Before hospital-grade disinfectant wipe-down testing begins, the moulded surface is inspected for release-agent migration and low-molecular-weight additive bloom because both influence stress-cracking behaviour. Non-patient-contact housings for nursing carts and mobile computing stations are injection moulded with a wall thickness of 2.5 mm to pass UL 94 V-0 without secondary flame shields. Medical cart enclosures require dimensional stability under repeated wipe-down with disinfectant solutions. The compound is moulded at a melt temperature of 245–255 °C and a mould temperature of 65 °C. Low-gloss finishes are produced by a chemical-etched mould surface. Mould release agents are not used because they migrate to the surface and reduce chemical resistance. Weld lines at the display bezel corners are relocated by sequential valve gates into low-stress areas. Screw boss outer diameter is designed at 2.0× the screw nominal diameter to reduce hoop stress and prevent radial cracking after repeated disassembly. Inserts are avoided where possible; when threaded inserts are required, they are ultrasonically installed after annealing, not in-mould, because insert residual stress increases susceptibility to disinfectant stress cracking.

    Electrical safety is evaluated under IEC 60601-1; the enclosure contributes to mechanical strength and fire protection but is not a patient-applied part. Flammability is tested under IEC 60695-11-10 at V-0. The material must be evaluated for compatibility with hospital-grade quaternary ammonium disinfectants and alcohol-free cleaners. Published data for FR2000BK under repeated exposure to 70% isopropyl alcohol is limited, and prolonged contact with alcohol-based cleaners may cause microcracking in stressed boss regions. Nursing cart covers are specified with a maximum wipe-down frequency of 4 cycles/day with neutral pH disinfectant and no alcohol immersion. Products include medication cart drawer fronts, monitor arm covers, battery door covers, and nurse station keyboard trays.

    Automotive Interior Brackets Retain Only a Limited Impact Window After Damp-Heat Ageing

    To prevent floating core shift when moulding 2.0–2.5 mm left-hand and right-hand under-dash brackets, the tool requires balanced flow and sequential valve gating. Processing is performed at melt temperatures of 250–260 °C with a mould temperature of 70–80 °C. A sequential valve-gate system is used on two-cavity tools for left-hand and right-hand brackets; the valve pins open with a delay of 0.3 s between cavities to compensate for slight runner length differences. Clamp force on a 2000 kN press is held at 80–90% of maximum to avoid over-packing flash at the parting line. Holding pressure is 50–70 MPa for 4–5 s. Screw back pressure is 0.7 MPa; screw speed is limited to 90 rpm. A standard three-plate cold-runner tool is avoided where possible because the extra runner drop increases regrind fraction and reduces impact retention.

    Flammability for automotive interior materials is assessed under ISO 3795 or FMVSS 302; the test records burn rate on conditioned specimens. The material is not relied upon as a fire barrier in the engine compartment. Odour and fogging testing under VDA 270 and ISO 12219-2 is required for interior parts. Published data for FR2000BK in full-vehicle odour panels is limited, and the grade should be validated before use in enclosed occupant compartments. After 85 °C/85% RH damp-heat ageing for 168 h, notched Charpy impact retention and tensile elongation retention are measured per ISO 179-1 and ISO 527-2. The moulded bracket must retain sufficient impact energy at −10 °C to pass the OEM knee-impact requirement, but exact values are component- and vehicle-specific. Terminal parts include adjustable steering column shrouds, seat side trims, under-dash brackets, and HVAC duct end caps.

    Free Quote

    Competitive Dongguan Zhongen PC/ABS FR2000BK prices that fit your budget—flexible terms and customized quotes for every order.

    For samples, pricing, or more information, please contact us at +8618005193850 or mail to sales8@ascent-chem.com.

    We will respond to you as soon as possible.

    Tel: +8618005193850

    Email: sales8@ascent-chem.com

    Inquiry

    Get Free Quote of Ascent Petrochem Holdings Co., Limited

    Flexible payment, competitive price, premium service - Inquire now!

    Certification & Compliance
    More Introduction

    The compound Dongguan Zhongen PC/ABS FR2000BK is a black flame-retardant polycarbonate/acrylonitrile-butadiene-styrene alloy supplied for injection moulding of electrical, electronic, and power-handling components where a UL 94 V-0 flammability rating is specified at a manufacturer-stated minimum wall thickness. Product-specific published data for this exact configuration are limited; therefore, the following technical descriptors combine supplier documentation fields with the property envelope reported for flame-retardant PC/ABS alloys tested under ISO, ASTM, and IEC methods. The material is not released for production without verification of the current supplier technical datasheet, lot certificate, and UL 94 certification card.

    The model code FR2000BK identifies the flame-retardant series and black colorant. The supplier controls the polycarbonate-to-ABS ratio and the flame-retardant chemistry. When halogen-free status is required, the material should be screened according to IEC 61249-2-21 or IEC 62321 for chlorine and bromine content. In halogen-free flame-retardant PC/ABS systems, phosphorus-based additives typically promote char formation and suppress afterflame times, but they raise density and require stricter moisture control than non-flame-retardant PC/ABS.

    What processing limits govern Dongguan Zhongen PC/ABS FR2000BK in thin-wall injection moulding?

    Pre-drying is mandatory before melt processing. A desiccant dryer with a dew point of -30 °C or lower is operated at 80 °C to 90 °C for 3 h to 4 h. Residual moisture must not exceed 0.02 wt%. Ambient relative humidity above 60% shortens the open-air hold time after drying; a heated hopper or closed conveying line is required in high-humidity production areas. Moisture above approximately 0.03 wt% triggers hydrolysis of the polycarbonate phase and phosphate ester flame retardant. The resulting acidic species further catalyze molecular weight loss, producing splay, delamination, and volatile emissions.

    The melt-temperature window is narrow. For wall sections above 1.5 mm, the barrel profile is typically set from 240 °C at the feed throat to 270 °C at the nozzle. For thin-wall parts below 1.0 mm, nozzle temperature may be raised to 275 °C. Operation above 280 °C degrades the ABS phase, produces carbonized deposits, and reduces impact strength. The metering-zone tolerance should be held within ±5 °C of the validated profile because the thermal degradation threshold of the ABS phase is close to the upper processing limit. Cumulative melt residence time above 280 °C should not exceed 5 min; longer residence generates black specks, surface blush, and loss of notched impact.

    A general-purpose injection screw with L/D 20:1 to 24:1 and compression ratio 2.2:1 to 2.8:1 is acceptable. High-shear mixing screws are not recommended because they generate excessive frictional heat and reduce residence time safety margins. Back pressure is maintained at 0.3 MPa to 0.7 MPa. Screw rotation speed on a 60 mm barrel is commonly 50 min⁻¹ to 90 min⁻¹; the recovery time should be shorter than the cooling time to avoid premature thermal degradation. Corrosion-resistant screw and barrel alloys or bimetallic coatings are preferred because the flame-retardant package can release acidic species during processing.

    Mould temperature is controlled between 60 °C and 90 °C. Lower mould temperatures increase melt viscosity, extend screw recovery time, and weaken weld lines. Injection speed is set from moderate to high to avoid gas burns. Hold pressure is normally 50% to 70% of peak injection pressure, with a cushion of 3 mm to 6 mm maintained at the screw tip. Production-scale twin-screw compounding lines using L/D 40:1 side-feed the flame-retardant package after polymer melting to limit thermal history; improper side-feeder venting causes yellowing and lot-to-lot viscosity drift. On injection moulding floors, gas deposits on cavity surfaces and nozzle drool indicate either residual moisture above the specified limit or barrel temperature overshoot above 280 °C.

    Compliance and test method set for Dongguan Zhongen PC/ABS FR2000BK documentation review
    ParameterMethod or directiveCondition or required output
    FlammabilityUL 94, IEC 60695-11-10V-0 at supplier-specified minimum thickness; certificate required per colorant lot
    DensityISO 1183-1Reported in g/cm³ on lot certificate
    Melt mass-flow rateISO 1133-1260 °C, 5 kg; lot tolerance applied
    Tensile propertiesISO 527-2 type 1A50 mm/min test speed
    Flexural modulusISO 1782 mm/min test speed, 4 mm specimen
    Notched Izod impactISO 180/1A23 °C and -30 °C
    Deflection temperature under loadISO 75-21.8 MPa, edgewise, 120 °C/h heating rate
    Vicat softening temperatureISO 306 B5050 N, 50 °C/h
    RoHS substance restrictionsIEC 62321Pb, Cd, Hg, Cr(VI), PBB, PBDE screening
    REACH SVHC complianceEC 1907/2006Supplier declaration or SDS review

    The property envelope used for initial part design is based on flame-retardant PC/ABS class data. Density under ISO 1183-1 is typically 1.18 g/cm³ to 1.20 g/cm³. Melt mass-flow rate at 260 °C and 5 kg commonly falls between 15 g/10 min and 25 g/10 min for a high-flow FR PC/ABS grade; the supplier-certified value for FR2000BK must be entered into mould-filling simulation. Tensile yield stress at 23 °C is ordinarily 55 MPa to 60 MPa, with tensile elongation at break from 30% to 60%. Flexural modulus is usually 2400 MPa to 2600 MPa. Notched Izod impact at 23 °C ranges from 35 kJ/m² to 55 kJ/m², falling to 10 kJ/m² to 20 kJ/m² at -30 °C. Deflection temperature under load at 1.8 MPa is typically 95 °C to 110 °C under ISO 75-2. Vicat softening temperature B50 is commonly 110 °C to 125 °C. These class-level values are not lot-specific guarantees; published data for this exact configuration is limited and must be confirmed against the current supplier datasheet.

    Class-level property comparison for material selection involving Dongguan Zhongen PC/ABS FR2000BK
    ParameterFR PC/ABS class including FR2000BKNon-FR general-purpose PC/ABSHalogenated FR PC/ABS
    Density1.18–1.20 g/cm³1.13–1.15 g/cm³1.18–1.22 g/cm³
    Tensile yield stress55–60 MPa50–60 MPa50–60 MPa
    Notched Izod impact at 23 °C35–55 kJ/m²45–70 kJ/m²20–40 kJ/m²
    HDT-A at 1.8 MPa95–110 °C105–120 °C100–110 °C
    FlammabilityUL 94 V-0 at supplier-specified thicknessUL 94 HBUL 94 V-0 at 1.6 mm
    Smoke generationLower than halogenated FR under ISO 5659-2Not rated as FRHigher smoke and acidic gas release
    Moisture sensitivityHigher; pre-drying mandatoryModerate; pre-drying recommendedModerate to high

    Flame-Retardant Packaging, Comparative Trade-Offs, and Regulatory Boundaries

    The flame-retardant system governs several processing and end-use trade-offs. In halogen-free phosphorus-based systems, the additive acts primarily in the condensed phase by promoting char and limiting fuel release. This mechanism lowers smoke generation relative to brominated flame-retardant PC/ABS, but it also increases moisture sensitivity and narrows the upper melt-temperature limit. Halogenated flame-retardant PC/ABS grades may retain higher notched impact after heat ageing and may be rated at thinner wall sections, but they typically exhibit higher smoke density and acidic gas release under fire. The selection of Dongguan Zhongen PC/ABS FR2000BK therefore depends on whether regulatory smoke toxicity, glow-wire ignition, and processability requirements outweigh the lower temperature ceiling and stricter drying constraints.

    Compared with non-flame-retardant PC/ABS, FR2000BK increases density and reduces melt stability because of the flame-retardant loading; however it provides UL 94 V-0 compliance required by end-product standards such as IEC 62368-1, IEC 60598, and IEC 60335. Compared with PC-only, the PC/ABS carrier lowers melt viscosity and improves flow, but lowers deflection temperature and chemical resistance. Compared with ABS alone, the PC phase raises heat resistance and low-temperature impact, but increases drying requirements and cost. Compared with glass-filled flame-retardant PC/ABS, FR2000BK is an unfilled grade, giving lower flexural modulus and lower warpage at the expense of reduced stiffness and lower HDT. Compared with mineral-filled flame-retardant PC/ABS, the unfilled composition offers higher ductility and lower density, but lower flexural modulus and surface hardness.

    Dongguan Zhongen PC/ABS FR2000BK is used in injection-moulded parts where flame-retardant performance and dimensional stability are required. Typical production examples include power adapter housings, power distribution enclosures, battery-management system brackets, appliance control panels, and interior electronic housings. The grade is selected where the end-product standard specifies UL 94 V-0 at the certified minimum wall thickness. Part design should avoid wall thickness below the certified minimum and should provide adequate venting to release gases from the flame-retardant package. Gates and runners should be sized to avoid excessive shear heating; hot-runner systems require thermocouple control within the same melt-temperature window.

    The operational boundary includes mandatory pre-drying at relative humidity above 60%. After drying, open-air hold time should not exceed 30 min without a heated hopper in humid environments. Clean sprues and runners may be reintroduced at up to 20 wt% after re-drying; higher regrind levels can reduce the UL 94 V-0 rating and notched impact. Dry blending with amine-containing masterbatches or additives is not recommended because amine species can accelerate polycarbonate degradation, producing brittleness, gas splays, and char deposits. The material is not recommended for continuous use above 85 °C under mechanical load unless creep data from the supplier confirms suitability, nor for outdoor exposure without UV stabilization. Any substitution from another FR PC/ABS grade must revalidate tooling, processing, and flame-retardant certification on production-scale equipment.

    Top