Products

Dongguan Zhongen PC/ABS 2500

    • Product Name: Dongguan Zhongen PC/ABS 2500
    • Factroy Site: Yinchuan, Ningxia, China
    • Price Inquiry: sales8@ascent-chem.com
    • Manufacturer: Ascent Petrochem Holdings Co., Limited
    • CONTACT NOW
    VTB
    Specifications
    HS Code 390933
    Grade Dongguan Zhongen PC/ABS 2500
    Material Type PC/ABS blend
    Density 1.13 g/cm³
    Melt Flow Rate 260 C 5 Kg 10 g/10 min
    Tensile Strength 60 MPa
    Elongation At Break 50%
    Flexural Modulus 2300 MPa
    Flexural Strength 90 MPa
    Notched Izod Impact Strength 23 C 45 kJ/m²
    Heat Deflection Temperature 1 82 Mpa 105 °C
    Vicat Softening Temperature 120 °C
    Flammability UL94 HB
    Molding Shrinkage 0.5%
    Water Absorption 0.1%

    As an accredited Dongguan Zhongen PC/ABS 2500 factory, we enforce strict quality protocols—every batch undergoes rigorous testing to ensure consistent efficacy and safety standards.

    Packing & Storage
    Packing Dongguan Zhongen PC/ABS 2500 is supplied in 25 kg moisture-barrier bags, with 40 bags per pallet.
    Container Loading (20′ FCL) Container Loading (20′ FCL): Dongguan Zhongen PC/ABS 2500 resin palletized, stowed, and secured in a 20-foot FCL for safe transport.
    Shipping Dongguan Zhongen PC/ABS 2500 is shipped as non-hazardous thermoplastic resin pellets, typically in 25 kg moisture-barrier bags on pallets. Transport in clean, dry containers or trucks at ambient temperature, avoiding direct sunlight, heat, and moisture. No special dangerous-goods classification is required.
    Storage Store Dongguan Zhongen PC/ABS 2500 in a cool, dry, well-ventilated area away from direct sunlight, heat, sparks, and open flames. Keep material in original sealed, labeled packaging on pallets, avoiding moisture, dust, and physical damage. Maintain good housekeeping and static control; segregate from incompatible chemicals and follow the manufacturer’s SDS and local regulations.
    Shelf Life Typically 24 months when stored dry in original sealed packaging, away from heat and direct sunlight.
    Application of Dongguan Zhongen PC/ABS 2500

    In automotive interior carrier applications, Dongguan Zhongen PC/ABS 2500 is formulated as the matrix resin at 85–95 wt%, with 3–8 wt% impact modifier, 2–5 wt% talc or wollastonite for dimensional stability, 1–3 wt% color masterbatch, and 0.2–0.5 wt% processing stabilizer. The compounding step is run on a twin-screw extruder with 40:1 L/D ratio at 240–260 °C melt temperature before the compound is dried at 100–110 °C for 4 h with a -40 °C dew point air supply; final injection molding on a 2,200 t clamp force press with sequential valve gating uses barrel zones of 240/255/265/265 °C, mold temperature 80–90 °C, fill time 2.5–4.5 s, pack pressure 55–75 MPa, and cooling time 25–40 s. Production-scale failure modes observed in this segment include gloss deviations at knit lines when lower mold temperatures are used, and polycarbonate chain scission when the melt residence time exceeds 8 min at 260 °C. Compliance for interior trim is anchored to ISO 3795:1989 and FMVSS 302 for horizontal burn rate, to VDA 278:2011 for volatile organic compound emission, to VDA 270:2018 for odor rating, and to REACH (EC) No 1907/2006 for substance restrictions. Terminal parts include HVAC outlet assemblies, instrument cluster surrounds, door panel snap-fit ribs, center console lower carriers, and B-pillar trim claddings. Recycled sprue and runner regrind can be introduced at up to 20 wt% only after the same drying protocol; contact with hydrocarbon-based plasticizers and high-aromatic greases is a known stress-cracking incompatibility.

    Where Does PC/ABS 2500 Fit in Battery Charger Housings?

    For battery charger enclosures, the non-flame-retardant baseline uses neat Dongguan Zhongen PC/ABS 2500 at 97–99 wt% with 1–2 wt% color masterbatch and 0.2–0.5 wt% processing aid; when a V-2 or V-0 enclosure is required, the same resin is used as the matrix at 88–92 wt% with 8–12 wt% phosphorus-based flame-retardant masterbatch and 0.2–0.4 wt% anti-dripping additive. The compounding operation is run on a 40:1 L/D twin-screw extruder with barrel zones 230–260 °C and screw speed 300–450 rpm; the assembled compound is then dried at 100–110 °C for 4–5 h to 0.02% moisture or below. Thin-wall injection molding is carried out at 1.5–2.0 mm wall thickness, melt temperature 240–260 °C, mold temperature 60–80 °C, injection speed 150–250 mm/s, and pack pressure 50–70 MPa. Published data for Dongguan Zhongen PC/ABS 2500 as a standalone grade are limited, and the relevant fire classification is therefore established on the compounded formulation, not on the neat pellet. Compliance for this segment includes IEC 62368-1:2018 clause 6.4 for fire enclosures in ICT/AV equipment, IEC 62196-1:2022 for EV conductive charging accessories, UL 94 horizontal and vertical burn ratings at the relevant wall thickness, RoHS 2011/65/EU Annex II, and REACH SVHC screening. Terminal finished parts comprise USB-C charger shells, power bank frames, AC charging inlet housings, adapter plug covers, and wall-plug or desktop charger enclosures. Plate-out of phosphorus species on mold vents after 8–12 h continuous operation is a known production bottleneck; cleaning cycles and vent vacuum maintenance are required more frequently than in non-flame-retardant runs.

    Non-fluid-contact diagnostic enclosures demand a compliance hierarchy that starts with ISO 10993-1:2018 biological evaluation risk assessment, supported by ISO 10993-5:2009 cytotoxicity and ISO 10993-10:2021 irritation and sensitization data on the final molded article. Dongguan Zhongen PC/ABS 2500 may be used only after successful biological evaluation on the final molded component; the material is molded at 100 wt% virgin resin with 0.2–0.5 wt% antioxidant and 1–2 wt% validated color masterbatch, and regrind is not permitted in this segment. The downstream process is injection molding in an ISO 14644-1:2015 Class 8 cleanroom, using melt temperature 250–270 °C, mold temperature 60–80 °C, clamp force 300–800 t, and total cycle time 35–60 s. Electrical safety is controlled to IEC 60601-1:2005+A1:2012 creepage and clearance requirements for medical electrical equipment, and RoHS 2011/65/EU applies to electrical components integrated into the enclosure. Terminal product types include ultrasound cart enclosure panels, patient monitor rear covers, infusion pump front bezels, and diagnostic analyzer display bezels. Sterilization exposure is an operational boundary: repeated steam autoclave cycles are not recommended because of PC/ABS distortion risk, and gamma irradiation above 25 kGy may produce measurable yellowing even when impact retention remains acceptable.

    Impact-Loaded Motor Housings in Handheld Rotary Tools

    In impact-loaded motor housings, the formulation is shifted toward low-temperature ductility: Dongguan Zhongen PC/ABS 2500 is loaded at 92–97 wt% with 2–5 wt% polyolefinic impact modifier, 0.3–0.5 wt% UV stabilizer, and 1–2 wt% colorant. The compounds are injection-molded on 800–1,200 t clamp force machines, with gas-assisted injection used in hollow handle sections at gas pressure 15–25 MPa; melt temperature is 250–270 °C, mold temperature 65–85 °C, injection speed 120–200 mm/s, and pack pressure 65–80 MPa. Weld-line strength at fastener bosses is maintained by high injection speed and pack pressure, not by raising mold temperature above 90 °C, because higher mold temperature extends cycle time without proportionally improving knit-line Charpy notched impact. Compliance is anchored to IEC 62841-1:2014 for hand-held motor-operated electric tools, UL 94 HB for non-flame-retardant housing parts, and RoHS 2011/65/EU Annex II. Terminal finished product types are drill/driver clamshell housings, angle grinder rear handles, orbital sander bodies, and leaf blower motor shrouds. At -20 °C, low-temperature impact retention is evaluated according to ISO 179-1:2010; cutting oil and brake fluid contact is an incompatibility risk because these fluids accelerate environmental stress cracking at highly packed screw bosses.

    Sheet Extrusion Reduces Warpage in SMT Carrier Grade PC/ABS 2500

    For static-dissipative SMT carrier stock, Dongguan Zhongen PC/ABS 2500 is loaded as the matrix at 85–92 wt%, with 8–15 wt% conductive carbon black or carbon nanotube concentrate and 0.3–0.8 wt% processing lubricant; the targeted surface resistivity is 103–109 Ω per IEC 61340-2-3:2016. The downstream process is slot-die sheet extrusion at melt temperature 240–260 °C and roll stack temperature 80–110 °C, followed by plug-assist thermoforming at sheet surface temperature 160–190 °C; sheet gauge runs 1.5–3.0 mm. Published data for this specific configuration is limited, but industrial sheet extrusion records indicate carbon-black concentrates can raise apparent melt viscosity by 20–40% relative to neat PC/ABS, so die lip openings are adjusted by 0.2–0.5 mm to prevent pressure spikes above 140 bar. Amine-based antistatic additives are avoided because they can accelerate polycarbonate degradation at these processing temperatures. Compliance is anchored to ANSI/ESD S20.20-2021, IEC 61340-5-1:2016 for ESD protection, RoHS 2011/65/EU Annex II, and ISO 14644-1:2015 for particulate cleanliness. Terminal finished parts include SMT component trays, PCB kitting trays, bare die transport trays, and hard disk drive carrier trays. Continuous-use temperature is limited to 110 °C because thermoformed antistatic trays can creep at pins or support ribs; pre-drying at 100–110 °C for 4 h remains mandatory before sheet extrusion.

    When UV Retention Governs Smart Meter Housings

    Outdoor smart meter enclosures impose simultaneous requirements for dimensional stability, UV retention, and sealing surface flatness; Dongguan Zhongen PC/ABS 2500 is compounded at 90–95 wt% with 1–3 wt% hindered amine UV stabilizer masterbatch, 0.2–0.5 wt% antioxidant, and 1–2 wt% colorant. The processing route is hot-runner injection molding on 500–800 t clamp force presses with melt temperature 250–270 °C, mold temperature 70–90 °C, fill pressure 80–100 MPa, pack pressure 55–70 MPa, and cooling time 30–50 s; gate seal time is validated with short-shot fill studies to avoid sink at sealing bosses. Compliance for utility enclosures includes IEC 62052-11:2020 for electricity metering equipment, IEC 60529:1989+A2:2013 for IP54 or IP55 ingress protection, UL 746C for outdoor UV and water exposure evaluation, RoHS 2011/65/EU Annex II, and REACH SVHC screening. Terminal product types include single-phase smart electricity meter outer shells, data concentrator boxes, water meter register covers, and IoT gateway enclosures. After 1,000 h of ISO 4892-2:2013 method A cycle 1 at 0.50 W/m² at 340 nm, non-UV-stabilized PC/ABS can exhibit Δb* shifts exceeding 5; even stabilized grades for smart meter housings require a black or dark color to mask yellowing. Regrind use is limited to non-cosmetic inner layers at 10–20 wt% and is not permitted on UV-exposed outer surfaces because lot-to-lot color shift becomes unacceptable to utility procurement specifications.

    Free Quote

    Competitive Dongguan Zhongen PC/ABS 2500 prices that fit your budget—flexible terms and customized quotes for every order.

    For samples, pricing, or more information, please contact us at +8618005193850 or mail to sales8@ascent-chem.com.

    We will respond to you as soon as possible.

    Tel: +8618005193850

    Email: sales8@ascent-chem.com

    Inquiry

    Get Free Quote of Ascent Petrochem Holdings Co., Limited

    Flexible payment, competitive price, premium service - Inquire now!

    Certification & Compliance
    More Introduction

    Dongguan Zhongen PC/ABS 2500 is supplied as a pelletized polycarbonate/acrylonitrile-butadiene-styrene compound. The suffix 2500 is an internal grade identifier; it does not denote a flammability class, impact modifier loading, or a specification under ISO or ASTM nomenclature. Published data for this specific configuration is limited. Where a production decision depends on exact values, the lot-specific certificate of analysis from the producer is the controlling document. The following description is based on the general medium-flow PC/ABS product class and on process ranges that are widely applicable to PC/ABS compounds, not on an unverified producer datasheet.

    Product specifications for this class normally include density, melt volume-flow rate, tensile properties, flexural modulus, notched impact strength, heat deflection temperature, and moisture content after drying. A representative medium-flow PC/ABS envelope may be stated as density 1.12 g/cm³ to 1.15 g/cm³ by ISO 1183-1:2019; melt volume-flow rate 15 cm³/10 min to 25 cm³/10 min at 260 °C under 5 kg by ISO 1133-1:2022; tensile stress at yield 50 MPa to 58 MPa by ISO 527-2:2012; flexural modulus 2,100 MPa to 2,500 MPa by ISO 178:2019; notched Charpy impact strength 35 kJ/m² to 55 kJ/m² at 23 °C by ISO 179-1:2010; and heat deflection temperature 95 °C to 110 °C at 1.8 MPa by ISO 75-2:2013. These values are reference envelopes rather than certified minimums or maximums for PC/ABS 2500.

    Formulation variables for PC/ABS 2500 include the polycarbonate-to-ABS ratio, impact modifier type, and heat stabilizer package. In co-rotating twin-screw compounding, phase morphology is controlled by screw configuration. Typical compounding uses an extruder with an L/D ratio of 40:1 to 48:1 and a melt temperature of 260 °C to 280 °C. If the polycarbonate fraction is increased, heat resistance improves but flow length decreases; if the ABS fraction is increased, mouldability improves but heat deflection temperature and solvent resistance decline. The 2500 grade is therefore positioned for balanced flow and impact rather than maximum heat resistance.

    What Processing Window Is Required for Thin-Wall Moulding?

    Resin preparation before moulding is a critical boundary condition. Virgin pellets should be dried in a desiccant dryer with a dew point no higher than −30 °C. A drying temperature of 80 °C to 100 °C for 3 h to 4 h is typical; at ambient relative humidity above 60%, dwell time should be extended to 6 h or more. The residual moisture target is below 0.02% by weight. Melt temperature at the nozzle is typically maintained between 240 °C and 270 °C. Mould surface temperature is usually set between 60 °C and 80 °C to balance weld-line strength and gloss. On injection moulding machines with clamp force below 1,200 kN, reduced shot volume and moderate injection speed are preferred to limit jetting, gas traps, and uneven filling. Back pressure from 5 bar to 15 bar and a peripheral screw speed from 0.3 m/s to 0.7 m/s are consistent with standard PC/ABS moulding practice. Hot-runner systems should use externally heated manifolds with no dead spots; total residence time at melt temperature should not exceed 8 min to 10 min.

    At a melt temperature of 260 °C and a 5 kg applied load, the melt volume-flow rate range of 15 cm³/10 min to 25 cm³/10 min positions a medium-flow grade between high-impact ABS and low-viscosity polycarbonate. This viscosity level permits filling of wall sections from 1.0 mm to 2.5 mm when gate diameter and venting are adequate. Spiral flow length is mould-dependent and cannot be represented by a single universal value. The shear-thinning behaviour of PC/ABS 2500 is typical of a two-phase blend: the polycarbonate contributes heat resistance and impact strength, while the ABS phase improves melt processability and lowers notched sensitivity. Mould filling analysis should use pressure-volume-temperature data for the specific lot, not generic class data, when gate freeze time or packing pressure must be predicted.

    Tool design influences the effective processing window. Gates with land lengths below 0.5 mm can generate excessive shear heating, while land lengths above 1.5 mm can freeze prematurely in thin walls. Vent grooves should be placed along the last fill point and at weld-line locations; a depth of 0.02 mm to 0.03 mm is typical for unfilled PC/ABS. Ejector pins should be positioned to allow uniform part removal because the blend exhibits a higher coefficient of linear thermal expansion than steel, and differential shrinkage in ribbed sections can cause sink marks or warpage. Mould filling simulations should use a no-flow temperature of approximately 220 °C and a transition temperature above 130 °C; these are class-typical values, not supplier-certified constants.

    When Drying Deviates from the Specified Dew-Point Window

    Residual moisture above 0.02% by weight before melt processing can hydrolyse the polycarbonate phase. The result is a measurable loss of molecular weight that appears on the moulded part as surface splay, silver streaks, reduced weld-line strength, and lower notched impact resistance. In production-scale twin-screw compounding, moisture-related degradation is frequently observed as melt-pressure fluctuation at the die, yellowing of the strand, and an increase in melt volume-flow rate because chain scission reduces viscosity. A desiccant dryer with a dew point of −30 °C or lower is preferred; hot-air drying alone is not considered sufficient when ambient moisture exceeds 60% relative humidity. If dried pellets remain exposed to plant air for more than 30 min before entering the feed throat, re-drying is required. Return regrind should be limited to 20% by weight and dried to the same moisture target.

    Regulatory Test and Certification Matrix

    The following test standards are typically applied to PC/ABS 2500 when a compliance dossier is prepared. The presence of a standard in this matrix does not imply that the producer has certified every grade to that standard; certification must be verified from the lot-specific certificate.

    Property or requirement Standard or regulation Typical condition
    RoHS restricted substances Directive 2011/65/EU as amended by (EU) 2015/863 Certificate required from supplier
    REACH SVHC declaration Regulation (EC) No 1907/2006, Article 33 0.1% w/w threshold per SVHC
    Flammability UL 94 Thickness 1.5 mm or 3.0 mm; class must be stated on yellow card
    Density ISO 1183-1:2019 23 °C
    Melt volume-flow rate ISO 1133-1:2022 260 °C/5 kg
    Tensile properties ISO 527-2:2012 50 mm/min
    Flexural properties ISO 178:2019 2 mm/min
    Notched impact strength ISO 179-1:2010 23 °C and −30 °C
    Heat deflection temperature ISO 75-2:2013 1.8 MPa flatwise
    Vicat softening temperature ISO 306:2022 50 N, 50 °C/h
    Water absorption ISO 62:2008 24 h at 23 °C

    Applications for a medium-flow PC/ABS such as 2500 are concentrated in thin-wall enclosures, automotive interior brackets, electronic housings, and appliance control panels. In field use, the product class is selected when the part requires higher heat resistance than ABS and better flow than straight polycarbonate. A typical electronic housing with wall thickness 1.2 mm to 1.8 mm can be filled on a 1,500 kN injection moulding machine when the gate is sized for shear rates below 100,000 s⁻¹ and venting is maintained at 0.02 mm to 0.03 mm depth. Weld-line strength in such parts depends on melt temperature and mould temperature; if mould temperature falls below 60 °C, impact properties at weld lines degrade more rapidly than tensile properties. Published data for this specific configuration is limited in open literature, so pilot trials on the target tool are required before series production.

    For automotive interior use, fogging behaviour may be measured by DIN 75201:2011-09 or ISO 6452:2021, and emission behaviour by VDA 278 depending on the OEM specification. These are not inherent properties of the base resin; they are formulation- and processing-dependent. A valve-gated hot-runner system may be used to reduce gate blush on visible surfaces, but the higher shear rates in the gate can raise local melt temperature by 10 °C to 20 °C and should be accounted for in the moulding window.

    Thermal and Impact Properties Shift When ABS Is Replaced by PC/ABS 2500

    When unfilled ABS is replaced by PC/ABS 2500, heat deflection temperature under 1.8 MPa generally increases from typical ABS values around 75 °C to 95 °C up to 110 °C, while tensile stress at yield moves from roughly 40 MPa to the 50 MPa to 58 MPa envelope. Compared with straight polycarbonate, the blend sacrifices some optical clarity and maximum continuous service temperature but improves melt flow and notch sensitivity. A lower-flow PC/ABS grade may have a melt volume-flow rate below 10 cm³/10 min at 260 °C/5 kg, limiting filling of wall sections thinner than 1.0 mm; a higher-flow grade above 30 cm³/10 min may permit faster filling but can exhibit lower notched impact strength at −30 °C because of lower molecular weight or higher melt-index additives. If UL 94 V-0 at 1.5 mm is required, a flame-retardant PC/ABS grade is needed; PC/ABS 2500 in its general unfilled form is not automatically classified V-0.

    Incoming quality control for PC/ABS 2500 should include moisture analysis by Karl Fischer titration, melt volume-flow rate, and a reference moulding check. Lot-to-lot variability in impact strength can be detected with a notched Charpy test at 23 °C and −30 °C; a difference of more than 10% from the agreed baseline may indicate a formulation drift or drying fault. On-line melt pressure monitoring during compounding is used to identify unstable feedstock or incorrect screw configuration. These controls are derived from standard polymer processing practice rather than from a published Dongguan Zhongen quality plan.

    Processing limitations for PC/ABS 2500 include sensitivity to moisture, residence time, and abrasive pigments. The compound is not recommended for direct contact with strong alkaline media, ketones, or aromatic hydrocarbons because the polycarbonate phase can undergo environmental stress cracking. If parts are post-machined or metal-insert moulded, the insert temperature should be maintained above 100 °C to reduce residual stress concentration. The operational boundary must be confirmed on the specific tool because published data for this specific configuration in aggressive chemical environments is limited.

    Top