Products

Dongguan Haohan Plastic PC/ABS JH3006C(2)

    • Product Name: Dongguan Haohan Plastic PC/ABS JH3006C(2)
    • Factroy Site: Yinchuan, Ningxia, China
    • Price Inquiry: sales8@ascent-chem.com
    • Manufacturer: Ascent Petrochem Holdings Co., Limited
    • CONTACT NOW
    VTB
    Specifications
    HS Code 164909
    Product Name Dongguan Haohan Plastic PC/ABS JH3006C(2)
    Manufacturer Dongguan Haohan Plastic
    Grade JH3006C(2)
    Material Type PC/ABS blend
    Density 1.18 g/cm3
    Melt Flow Rate 10 g/10 min
    Tensile Strength 55 MPa
    Elongation At Break 50%
    Flexural Strength 80 MPa
    Flexural Modulus 2200 MPa
    Notched Izod Impact Strength 40 kJ/m2
    Heat Deflection Temperature 95 °C
    Vicat Softening Temperature 110 °C
    Flame Retardancy V-0 at 1.6 mm
    Processing Method Injection molding
    Drying Temperature 80–100 °C
    Drying Time 2–4 h
    Melt Temperature 230–260 °C
    Mold Temperature 50–80 °C
    Color Natural / custom colors available

    As an accredited Dongguan Haohan Plastic PC/ABS JH3006C(2) factory, we enforce strict quality protocols—every batch undergoes rigorous testing to ensure consistent efficacy and safety standards.

    Packing & Storage
    Packing Dongguan Haohan Plastic PC/ABS JH3006C(2) is supplied in 25 kg net-weight moisture-proof bags, palletized for secure transport.
    Container Loading (20′ FCL) Dongguan Haohan Plastic PC/ABS JH3006C(2) is packed and loaded into a 20′ FCL container for safe sea shipment.
    Shipping Dongguan Haohan Plastic PC/ABS JH3006C(2) is shipped as a non-hazardous plastic compound in sealed moisture-proof 25 kg bags or octabins on pallets. Transport by truck, sea, or air under dry conditions; avoid heat, sunlight, and punctures. Store in a cool, dry, ventilated area away from direct moisture.
    Storage Store Dongguan Haohan Plastic PC/ABS JH3006C(2) in a cool, dry, well-ventilated warehouse, away from direct sunlight, heat, flames, and strong oxidizers. Keep original bags/containers tightly sealed on pallets; avoid moisture, dust, and physical damage. Maintain moderate temperature and low humidity, use oldest stock first, and dry as required before processing.
    Shelf Life Shelf life is typically 12 months when stored in original sealed packaging, in a cool, dry place away from sunlight and moisture.
    Application of Dongguan Haohan Plastic PC/ABS JH3006C(2)

    During injection moulding of door trim carriers, lower centre console brackets and HVAC control carrier frames, the moulder operates within a narrow processing corridor because the polycarbonate phase in Dongguan Haohan Plastic PC/ABS JH3006C(2) controls heat resistance and impact, while the ABS phase controls flow and dimensional stability. The melt temperature is maintained between 250 °C and 275 °C at the nozzle to avoid visible flow lines and to preserve the molecular weight of the polycarbonate phase; a back pressure of 5–10 bar hydraulic and a screw L/D ratio of 20:1–24:1 are used to disperse the ABS-rich domains without excessive shear heating. Pre-drying at 80 °C for 3–4 h in a desiccant dryer with a dew point below -20 °C is mandatory when the moulding shop relative humidity exceeds 60% RH, because residual moisture above 0.02 wt% induces splay, surface delamination and a loss of notched Izod impact. The virgin-to-regrind ratio is limited to 70:30; higher regrind levels reduce low-temperature notched Izod impact measured under ISO 180/A at -30 °C and increase the risk of brittle failure at knit lines in cold-climate vehicles. Mould temperature is held at 70–90 °C for flatness and to reduce internal stress, while holding pressure and holding time are set to avoid sink marks over ribs and bosses. For interior compliance, the moulded parts are evaluated to ISO 3795 burning rate and, depending on the OEM material approval, VDA 278 VOC/FOG limits; grade-specific pass/fail values must be confirmed from the supplier datasheet and the OEM approved source list. End products include door handle recess brackets, centre console side carriers, shifter surround substrates and HVAC control panel retainers.

    Does Outdoor UV Exposure Reduce the Comparative Tracking Index of Flame-Retardant PC/ABS in EVSE Enclosures?

    For indoor and partially weather-protected electric vehicle supply equipment (EVSE) enclosures, charge controller front covers and cable retention brackets, the failure mechanism after 1,000 h of cyclic humidity and UV exposure is not gross embrittlement but a shift in surface resistivity and comparative tracking index that can lead to creepage path failure. Dongguan Haohan Plastic PC/ABS JH3006C(2) is processed at a narrower melt-temperature window of 240–260 °C because the flame-retardant package and UV stabilizer are heat-sensitive; excessive melt temperature causes plate-out on the mould cavity, black specks and a drop in notched Izod impact. Screw geometry is specified with a compression ratio of 2.0–2.5:1 and an L/D ratio of 20:1–24:1 to limit shear heating. Mould temperature is set between 60 °C and 80 °C, with a fill time of 0.8–1.2 s for a 2.0 mm nominal wall and holding pressure at 40–60 MPa hydraulic to maintain dimensional stability around metal inserts. Masterbatch and colorant loadings are kept in the range of 0.5–1.5 wt%; the flame-retardant package concentration is supplier-locked and must not be adjusted by dry blending, because even 0.3 wt% of a non-approved carrier resin can alter UL 94 behaviour at the final thickness. Post-mould annealing at 85 °C for 1–2 h is applied when metal inserts or press-fit brass inserts are used, to relieve moulded-in stress and reduce the risk of environmental stress cracking around the boss edges. End products include wall-mounted AC charge controller front covers, internal cable retention brackets, door interlock actuator housings and surge-protection module shells.

    Compliance matrix for indoor EVSE enclosure applications
    AssessmentStandard / methodConditionThreshold applied
    Flame retardancyUL 941.5 mm thicknessV-0 listing from supplier yellow card
    Glow-wire flammabilityIEC 60695-2-11850 °CNo ignition or self-extinguishing within 30 s
    Tracking resistanceIEC 60112Solution ACTI ≥ 300 V for insulation coordination
    End-product safetyIEC 62368-1Enclosure open-port accessMaterial pre-selection only; final device test required

    A benchtop diagnostic analyser bezel does not tolerate the same process latitude as a thicker automotive bracket because surface aesthetics, pin-hole-free texture and chemical resistance to cleaning agents dominate the acceptance criteria. For non-patient-contact housings in laboratory and clinical diagnostic equipment, Dongguan Haohan Plastic PC/ABS JH3006C(2) is typically processed at a melt temperature of 255–270 °C with a mould temperature of 70–90 °C; the higher mould temperature promotes replication of a fine-textured cavity surface and reduces the visual difference between gate and vent regions. Pre-drying is fixed at 80–90 °C for 3–4 h to a residual moisture level below 0.02 wt%. Formulation adjustments are limited to a colour masterbatch loading of 1–2 wt% and, where static dissipation is required, an antistatic masterbatch at 3–5 wt% to achieve a surface resistivity below 10¹² Ω. Cleaning-agent compatibility testing uses 70% isopropanol and 5% hydrogen peroxide wipes for 100 cycles; visual hazing or gloss change greater than 5 GU is a rejection criterion. Material-level cytotoxicity and skin sensitization may be assessed under ISO 10993-5 and ISO 10993-10, but the approval status of the exact JH3006C(2) grade must be verified from the supplier regulatory dossier because these tests are formulation-dependent. End products include benchtop analyser front bezels, ultrasound console control panels, IVD cartridge loading trays and portable diagnostic instrument top covers.

    Thin-Wall Moulding Parameters for Notebook Housings and Structural Ribs

    A 1.0 mm nominal wall stock on a notebook display back cover requires a melt volume-flow rate high enough to fill long flow paths without raising melt temperature into the polycarbonate degradation zone. The melt volume-flow rate of unfilled PC/ABS is determined at 260 °C/5 kg using ISO 1133-1:2022; for thin-wall grades, published datasheets typically place the value between 20 cm³/10 min and 30 cm³/10 min, but the exact JH3006C(2) lot value must be read from the certificate of analysis because batch-to-batch variation is not negligible. The moulding cell uses a hot runner manifold with valve-gated drops, a melt temperature of 260–280 °C, a mould temperature of 80–100 °C and an injection speed of 250–350 mm/s to maintain a stable flow front. Packing pressure is set at 60–80 MPa and held for 4–6 s; the cooling time is limited to 10–14 s to avoid cycle-time creep. Rib thickness is maintained at 0.4–0.6 of the adjoining wall to prevent sink marks, and the flow-path-to-wall-thickness ratio is kept below 150:1 at uncontrolled gate locations. Tensile modulus and notched Izod impact are verified on moulded plaques under ISO 527-2:2012 and ISO 180:2000/A, but only as incoming inspection checks; the final housing is tested under IEC 62368-1 for mechanical enclosure strength. End products include notebook display back covers, keyboard deck structural ribs, battery frame spacers and hinge reinforcement brackets.

    When Offline Painting of Washing Machine Top Covers Introduces Solvent Stress Cracking Risk in PC/ABS

    Painting a moulded washing machine top cover offline exposes the PC/ABS substrate to a solvent system that can initiate crazing at knit lines, gate vestiges and sharp corners, especially when the chosen thinner contains aromatic hydrocarbons, ketones or esters. Dongguan Haohan Plastic PC/ABS JH3006C(2) parts intended for offline painting are moulded at the upper end of the melt-temperature window, 270–280 °C, to reduce frozen-in orientation; the mould temperature is held at 80–100 °C and the fill time is extended to 1.5–2.5 s for a 2.5 mm wall to avoid high shear stress near the gate. Boss corners and rib roots are designed with a minimum radius of 0.8 mm because sharp internal radii act as stress concentrators when solvent absorption occurs. Post-mould annealing at 90–100 °C for 30 min is used before painting to relax residual stress; the parts are cooled slowly to below 60 °C before removal to prevent warpage. A silane-based adhesion promoter is applied at a dry film thickness of 1–2 µm when adhesion testing under ISO 2409 classifies the unpainted substrate as non-chemically receptive. No external mould release agents are permitted because even trace silicone or wax transfer reduces paint adhesion and creates fish eyes. Coated parts are cross-cut tested after 72 h of room-temperature ageing and after 10 cycles of thermal shock between -20 °C and 80 °C. End products include washing machine top covers, front-load washer control panel surrounds, refrigerator side panel decorative inlays and dishwasher front fascia inserts.

    Cycle-time targets for coffee machine exterior fascia parts force a different compromise between gloss, scratch resistance and glow-wire performance than automotive interior trim. The fascia is moulded in Dongguan Haohan Plastic PC/ABS JH3006C(2) at a melt temperature of 245–265 °C and a mould temperature of 60–80 °C; the lower mould temperature is chosen to shorten cooling time but it reduces surface gloss uniformity, so the cavity is textured with a matte finish to hide flow lines. Drying is performed at 80 °C for 3 h to a moisture content below 0.02 wt%; deviation from this drying regime produces silver streaks on dark-coloured parts. The formulation is adjusted only through a colour masterbatch at 1–2 wt% and a scratch-resistant additive package at 1–3 wt% where specified; the flame-retardant version is not diluted because glow-wire performance under IEC 60335-1 is thickness-dependent. Parts for unattended appliance use are tested at 850 °C glow-wire temperature; if the end product standard requires a flame rating, the supplier yellow card for the exact colour and wall thickness controls the decision. Post-mould trimming of gate flash is performed before annealing at 70 °C for 1 h, which stabilizes the boss locations for metal screws. End products include espresso machine front fascias, drip tray surrounds, steam wand cover brackets and grinder housing top covers.

    Free Quote

    Competitive Dongguan Haohan Plastic PC/ABS JH3006C(2) prices that fit your budget—flexible terms and customized quotes for every order.

    For samples, pricing, or more information, please contact us at +8618005193850 or mail to sales8@ascent-chem.com.

    We will respond to you as soon as possible.

    Tel: +8618005193850

    Email: sales8@ascent-chem.com

    Inquiry

    Get Free Quote of Ascent Petrochem Holdings Co., Limited

    Flexible payment, competitive price, premium service - Inquire now!

    Certification & Compliance
    More Introduction

    Dongguan Haohan Plastic PC/ABS JH3006C(2) is an unfilled polycarbonate/acrylonitrile-butadiene-styrene alloy supplied for injection-moulded structural parts that require a controlled balance of low-temperature ductility, heat resistance, and melt processability on equipment running below polycarbonate homopolymer temperatures. The model designation JH3006C(2) is a supplier-specific grade identifier; the parenthetical numeral may indicate a packaging or colouring variant and should be confirmed against the supplier certificate of analysis. The material is not a polymer blend containing glass fibre, mineral filler, or halogenated flame retardant. It belongs to the medium-flow unfilled PC/ABS class, and published reference data for that class place melt volume-flow rate under ISO 1133-1:2022 at 260 °C/5.0 kg between 8 cm³/10 min and 20 cm³/10 min. The polycarbonate phase contributes tensile modulus and heat deflection, while the ABS phase reduces warpage and improves processing latitude. Published multi-lot data for this exact grade are limited; therefore, the values in this document are representative public ranges for unfilled medium-flow PC/ABS and must not replace lot-specific test documentation.

    What Drying and Melt Preparation Requirements Apply Before Injection Moulding?

    Moisture control is the primary processing boundary condition. Unfilled PC/ABS absorbs atmospheric moisture, and processing at moisture contents above 0.02 wt% can generate splay, silver streaks, and molecular weight reduction through hydrolysis of the polycarbonate phase. A desiccant-bed dryer with supply-air dew point of -30 °C or lower is required. Drying at 80 °C to 100 °C for 3 h to 4 h is specified for opened bags that have been exposed for more than 30 min. In production areas above 60 % relative humidity, hopper residence time should not exceed 8 h unless a closed-loop conditioned-air hopper is used. Melt temperature measured at the nozzle should remain between 250 °C and 275 °C. Residence above 280 °C or total melt residence times beyond 10 min can generate dark specks and reduce notched impact strength. Mould surface temperature is normally maintained between 60 °C and 90 °C. Settings below 60 °C can produce flow hesitation and poor surface replication; settings above 100 °C may extend cycle time without proportional improvement in gloss or weld-line strength.

    Twin-screw compounding of unfilled PC/ABS in the 8 cm³/10 min to 20 cm³/10 min melt-flow band has been documented on lines with L/D ratios from 36:1 to 44:1. The ABS component is commonly side-fed after the PC melting zone to limit thermal history on the butadiene phase. For injection moulding, screw compression ratio should be 2.0:1 to 3.0:1, and back pressure should be held between 0.3 MPa and 0.7 MPa. Sustained back pressure above 1.0 MPa can increase shear heating and degrade the elastomeric phase. Shot weight should be 40 % to 75 % of barrel capacity. Below 40 % capacity, residence-time distribution widens and light-colour parts may show yellowing. Capillary rheometry on unfilled PC/ABS of this class indicates pseudoplastic behaviour: apparent viscosity at 260 °C and 1000 s⁻¹ is generally 180 Pa·s to 250 Pa·s, rising to 400 Pa·s to 600 Pa·s at 100 s⁻¹. The power-law index is typically 0.35 to 0.50. For a 1.5 mm nominal wall section, fill time should be 0.4 s to 0.8 s to avoid premature flow-front freeze-off.

    When Medium Flow and Low-Temperature Ductility Define the Selection Window

    Selection of JH3006C(2) rather than a high-heat PC/ABS or a mineral-filled PC/ABS occurs when the component must fill wall thicknesses between 1.2 mm and 2.5 mm without exceeding injection pressures of 120 MPa, and when the part must retain impact resistance at -30 °C without a separate elastomer-rich modifier. In this unfilled PC/ABS class, tensile stress at yield under ISO 527-2:2012 is commonly 50 MPa to 60 MPa, tensile modulus is 2100 MPa to 2500 MPa, and notched Charpy impact at 23 °C under ISO 180:2023 is 35 kJ/m² to 55 kJ/m². Test specimens are conditioned at 23 °C and 50 % relative humidity for at least 40 h under ISO 291:2008. Heat deflection temperature at 1.8 MPa under ISO 75-2:2020 is generally 100 °C to 118 °C, which is below polycarbonate homopolymer but adequate for painted interior trim, enclosures, and brackets exposed to localised temperatures up to 85 °C.

    Test standardPropertyRepresentative unfilled PC/ABS range
    ISO 1183-1:2019Density1.10 to 1.14 g/cm³
    ISO 1133-1:2022Melt volume-flow rate at 260 °C/5.0 kg8 to 20 cm³/10 min
    ISO 527-2:2012Tensile stress at yield50 to 60 MPa
    ISO 527-2:2012Tensile modulus2100 to 2500 MPa
    ISO 178:2019Flexural modulus2000 to 2400 MPa
    ISO 180:2023Charpy notched impact at 23 °C35 to 55 kJ/m²
    ISO 180:2023Charpy notched impact at -30 °C10 to 20 kJ/m²
    ISO 306:2022Vicat softening temperature, B50120 to 135 °C
    ISO 75-2:2020Heat deflection temperature at 1.8 MPa100 to 118 °C

    The tabulated values are public reference ranges for unfilled medium-flow PC/ABS, not certified lot-specific values for JH3006C(2). A supplier certificate of analysis should be obtained for production qualification, and specimen preparation should follow the exact conditioning and test-speed provisions in the cited standards.

    Differential Formulation Constraints Against Flame-Retardant and High-Heat PC/ABS Grades

    JH3006C(2) differs from flame-retardant PC/ABS in that no phosphate ester or brominated flame-retardant system is intentionally added. Flame-retardant PC/ABS grades may be classified UL 94 V-0 at 1.5 mm, but phosphate plasticisation can reduce heat deflection temperature below 95 °C at 1.8 MPa and increase mould deposit formation in hot-runner systems maintained above 260 °C. High-heat PC/ABS grades incorporating α-methylstyrene-based SAN raise Vicat softening temperature above 130 °C under ISO 306:2022, but their melt volume-flow rate at 260 °C/5.0 kg may fall below 6 cm³/10 min, increasing injection pressure requirements by 20 % to 35 % in multi-cavity tools. Compared with mineral-filled PC/ABS, JH3006C(2) has lower flexural modulus and higher elongation at break. Mineral-filled PC/ABS can achieve flexural modulus above 3000 MPa, but notched Charpy impact at -30 °C may fall below 6 kJ/m², making it unsuitable for cold-impact interior mounts. Compared with general-purpose extrusion PC/ABS, the injection-moulding designation JH3006C(2) is expected to have a narrower molecular weight distribution to reduce warpage and improve knit-line strength, although published comparative size-exclusion chromatography data for this exact grade are limited.

    The unfilled composition also affects shrinkage and post-moulding dimensional movement. Unfilled PC/ABS in this class typically exhibits parallel flow shrinkage of 0.5 % to 0.7 % and perpendicular flow shrinkage of 0.5 % to 0.8 % when measured under ISO 294-4:2018. Shrinkage anisotropy is lower than that of glass-fibre-reinforced grades, which can show a parallel-to-perpendicular shrinkage ratio exceeding 3:1. For painted parts, unfilled PC/ABS also avoids fibre read-through on Class A surfaces. The absence of mineral filler minimises tool wear, but the mould should still use hardened steel or stainless tooling for production runs above 500 000 cycles because of abrasive pigments or release agents that may be present in specific colour-matched lots.

    Application environments include interior structural brackets, electronic device enclosures, painted bezels, and plated or solvent-bonded subassemblies. Adhesion of polyurethane and acrylic coatings is evaluated under ASTM D3359-17 cross-cut tape test; unfilled PC/ABS with surface energy above 40 mN/m after corona or plasma treatment generally meets classification 5B. Solvent bonding to itself or to PC substrates is performed with methyl ethyl ketone or dichloromethane-based cement. Because the butadiene phase contains unsaturation, exposure to aromatic or ketone solvents above 40 °C should be limited to avoid stress crazing in regions with moulded-in stress. Thermoforming of extruded sheet from the same resin family is possible at wall thicknesses above 2.0 mm, with sheet surface temperature maintained between 150 °C and 170 °C; published data for this specific configuration is limited and should be validated on production tooling.

    Mould Filling, Gate Freeze-Off, and Clamp Force Boundaries

    Flow length in unfilled PC/ABS of this melt-flow class is approximately 0.8 mm to 1.0 mm per MPa of injection pressure for a 2.0 mm wall. For a 150 mm flow path, required hydraulic pressure can therefore exceed 180 MPa if the gate is undersized or melt temperature is below 240 °C. Gate land length should not exceed 0.5 times gate diameter, and valve-gated hot-runner nozzles should be set at 250 °C to 270 °C. Clamp force for multi-cavity tooling is calculated from projected part area; at a cavity pressure of 40 MPa, approximately 4 kN of clamp force is required per cm² of projected area. Hot-runner drops should avoid dead spots because residence above 10 min at 270 °C can produce black specks. After colour changes, purge intervals of 50 shots are typical in production troubleshooting literature for this resin family.

    Injection speeds below 60 mm/s have been associated with hesitation marks and incomplete packing on thin-wall sections below 1.2 mm. Holding pressure below 40 MPa can cause gate freeze-off before packing is complete, especially with subgates or tunnel gates of diameter below 0.8 mm. Mould filling simulations should use melt density of approximately 1.0 g/cm³ at processing temperature and solid density of 1.10 to 1.14 g/cm³. The thermal conductivity of unfilled PC/ABS is generally 0.20 W/(m·K) to 0.25 W/(m·K), which slows core cooling in thick sections; mould cooling channels should be sized to maintain a temperature differential below 10 °C across the tool face.

    Regulatory documentation for JH3006C(2) should confirm the presence or absence of substances listed in REACH Regulation (EC) No 1907/2006 as amended and RoHS Directive 2011/65/EU Annex II restricted substances. Ash content is determined under ISO 3451-1:2019; unfilled PC/ABS normally yields ash below 1.0 %. Moisture analysis is performed by Karl Fischer titration under ISO 15512:2019 or a thermogravimetric moisture balance calibrated to 0.01 wt% sensitivity. Because the grade contains butadiene-based rubber, prolonged exposure to ultraviolet radiation without UV stabilisation or coating leads to surface oxidation and gloss reduction. Components exposed to direct sunlight should be painted or use a UV-stabilised protective coating. Published compositional data for the specific antioxidant and release-agent package in JH3006C(2) are limited; therefore, adhesive bonding and coating compatibility should be verified on moulded plaques using the intended production paint line and ASTM D3359-17 cross-cut tape test.

    Top